Refurbishment in St John's Wood is dominated by one fact: the properties are big, and most of them are houses. A whole-house programme in a NW8 villa is not a scaled-up flat refit. It has multiple floors, a basement or lower ground, a garden that is part of the brief rather than an afterthought, sometimes an outbuilding or garage, and building services — heating, hot water, power, ventilation, security, sometimes cooling — that have to work as one system across all of it. And it sits in a conservation area, on a plot with neighbours close enough on either side that the party wall question is real.

The block work is the counterweight. A flat in a 1930s mansion block is a smaller footprint but a tighter cage: solid floors, shared risers, a porter, a lift that is your only route in and out, restricted hours, and a lease that decides what you may change. Both are refurbishment. They need different plans.

The villa programme: services are the spine

In a house refurbishment here, the finishes are the visible part and the smallest part of the risk. The programme is really about services, and services are where whole-house projects go wrong. A house that is having its kitchen rebuilt, a basement fitted out, three bathrooms redone and a loft finished is a house whose hot water demand, electrical load and ventilation strategy have all changed at once. If those are treated as three separate jobs, you get three separate compromises that fight each other — a cylinder that cannot serve the new bathrooms, a board that has no capacity for the kitchen and the charger, an extract route that was never designed and ends up wherever it could go.

So the first thing we do on a whole-house scheme is survey the services and size them for the finished house, not the current one. Where the main enters and what it can deliver. What the electrical supply can carry with everything running. Where plant will live and whether it can be got to for servicing. Where ducts can actually run, floor by floor, before ceilings are designed. Where basement drainage falls or has to be pumped. That work produces a scope, and the scope produces a fixed quote. Our NW8 plumbers and NW8 electricians are in that conversation from the start rather than being handed a fait accompli.

Consent: the part that sets your start date

St John's Wood carries conservation area designation, which adds planning control over external alterations — elevations, windows, roof changes, external plant, anything visible. Where a building is listed, listed building consent is typically needed for works affecting its special character, and that can reach internal features as well as the outside. Neither of these is a formality you deal with while the scaffold goes up. They govern when you can start.

Semi-detached and terraced villas add the Party Wall etc. Act 1996. Notifiable works — typically things like cutting into or building off a shared wall, certain excavation near a neighbour's foundations, and works to the party structure — require notice to adjoining owners, and the process has its own timetable. Whether your particular scheme is notifiable depends on exactly what is proposed, so establish it early with a surveyor. The recurring mistake is discovering a party wall obligation after a start date has been promised, which is an expensive way to learn.

For leasehold flats in the blocks, most leases require freeholder or managing-agent consent — usually a licence to alter — for anything beyond redecoration. That commonly bites on moving waste or soil connections, structural change, and floor finishes, and some leases carry acoustic requirements for hard flooring. Requirements vary from lease to lease, and freeholds in this area sit with a range of owners including large estates whose processes differ, so read your own lease and speak to your managing agent rather than relying on what a neighbour was allowed. Where a freeholder proposes works affecting leaseholders generally, Section 20 of the Landlord and Tenant Act 1985 sets consultation requirements for qualifying works over £250 per leaseholder — worth knowing if the building has a programme running alongside yours.

What the site imposes

NW8 is residential, and residential streets are unforgiving about construction logistics. A house refurbishment has to answer, before day one: where does material land, where does spoil go, where do skips or grab loads stand and for how long, and what is the noise position with the neighbours either side. Deliveries that are not scheduled become deliveries parked across somebody's drive. Waste that is not planned becomes waste stacked in a front garden. None of that is a small matter in a street where everyone can see it.

In a block, the constraints are formalised and tighter:

  • The porter is the gate. Contractors are booked and logged in, and access is on the building's terms. Expect a briefing, and expect it to be enforced.
  • Working hours are restricted. Most blocks limit hours and confine noisy work to a narrower window than general work, which changes how a programme is built — you plan noisy phases as blocks, not as a trickle across weeks.
  • The lift is the only route. Everything in and out passes through common parts, and lift and corridor protection is normally a condition of access.
  • Solid floors carry sound. Work travels sideways as well as down. Neighbour communication is part of the programme.
  • Isolation is shared. Water and sometimes power isolate at riser level, which means notice rather than a switch.

Sequencing a whole-house scheme

The order that keeps a large refurbishment honest is unglamorous. Survey and design first, with services sized for the finished house. Consents identified and started early — planning, listed building consent if applicable, party wall notices if notifiable, licence to alter if leasehold. A fixed, itemised scope and quote. Then site set-up: protection of everything staying, dust separation, and a defined route for materials and waste.

On site: strip-out and structural work first, while the house is dirty and open. Then first-fix services throughout — the stage where getting it right is cheap and getting it wrong is buried. Then the envelope and substrates: floors made rigid, walls made true, tanking where it belongs. Then plaster, then second fix, then finishes, then commissioning and certification. Electrical work in dwellings falls under Part P with installations to BS 7671, and any bathrooms in the scheme engage Part F for ventilation and Part G for sanitation and hot water — designed in, not bolted on at the end. See bathroom refurbishment in St John's Wood for how those rooms run within a larger programme.

Two sequencing points are worth defending. First, decide the kitchen and bathroom layouts before first fix, not during it — every late change to a fixed position is paid for twice. Second, do not let finishes start while services are still being adjusted. A newly laid floor with a plumber still working above it is a floor that will be lifted.

Gardens and outbuildings

Because NW8 gardens are substantial, they are often in scope: a garden room, a studio, a garage conversion, external lighting, irrigation, a pool or plant enclosure. The point to hold onto is that these are buildings with services, and their services must be designed with the house's, not tacked on after the slab is poured. Water needs isolation from inside the house and a means of draining before winter. Power needs a correctly sized armoured supply at the right depth with isolation at both ends. Drainage needs somewhere to fall to, or a pump. And external work is exactly where conservation area controls are most likely to apply. Sorting this at design stage costs a conversation; sorting it afterwards costs a lawn.

What to ask before you appoint anyone

Ask what the quote actually includes — protection, waste removal, making good, certification, commissioning — because those are the items that reappear as extras. Ask who is your single point of contact and whether that person is on site. Ask how consents are being handled and who is responsible for chasing them. Ask what the programme assumes about access hours, and whether that assumption has been checked with the porter or agent. Ask what happens when something is found behind a wall — because in a period house, something will be. The answer you want is a defined process for pricing and agreeing a variation before it is done, not a shrug.

How we price it

Refurbishment is quoted per project — the scope is the price, and there is no honest way to publish a single figure for work that ranges from one room to a whole house. What we do commit to is that you get a fixed, itemised quotation before work starts, that variations are priced and agreed before they happen, and that the number you sign is the number you pay unless you change the scope.

More on our approach is on the refurbishment page, and the rest of what we do locally is on the St John's Wood area page. Once a property is finished, keeping it that way is maintenance — planned rather than reactive. Agents and managing companies handling refurbishment across a portfolio should see working with us as an agent. Otherwise, tell us about the property and we will come back with something specific.